
Powder Coated Heavy Duty Adjustable Industrial Pallet Racking
Fully adjustable beams every 50 mm — the workhorse for Heredia 3PLs balancing many SKUs with heavy pallet loads.
View productFrom selective high-bay pallet racking to cantilever and double-deep systems, every product below can be configured to Heredia's seismic code, slab conditions and free-zone warehouse heights.

Fully adjustable beams every 50 mm — the workhorse for Heredia 3PLs balancing many SKUs with heavy pallet loads.
View product
Purpose-configured for cartons, film rolls and corrugated stock — ideal for Heredia's free-zone packaging and medical device suppliers.
View product
2000 kg per layer, powder coated and boltless — fast to erect, which shortens downtime in occupied Heredia warehouses.
View product
Two pallets deep per face — nearly 40% more pallet positions than selective racking in the same Heredia building footprint.
View product
CE-marked EURO profile for heavy industrial loads — the specification Heredia's medical device and electronics plants request.
View product
100% selective access with custom heights up to 12 m — the standard for Heredia logistics hubs handling fast-turn inventory.
View product
Engineered for high load pallet storage with reinforced uprights — built to Costa Rica's seismic zone requirements.
View product
For pipe, steel bar and long profiles — the go-to for construction suppliers and mining contractors serving Heredia's industrial belt.
View productHeredia sits at the heart of Costa Rica's free-zone and medical device corridor. Racking here is not generic — it is specified against seismic risk, tropical humidity, free-zone customs oversight and a building stock with clear heights that varies from 8 m to over 12 m.
Costa Rica's seismic zone intensity demands reinforced base plates, heavier bracing and chemically anchored feet — a baseline we calculate per site, not per catalog.
Heredia's humidity and rainy season cycle corrodes untreated steel quickly. All components are phosphated and powder coated, with galvanized options available.
Heredia's Zona Franca warehouses require precise customs files. We prepare commercial invoice, packing list, B/L and certificate of origin with Spanish part labeling.
Direct shipments to Puerto Limón (Caribbean side) and Caldera (Pacific side), with indicative transit of 25–35 days from Chinese ports.
Founded in 2007, Lottot Storage Solutions Co., Ltd. engineers and manufactures industrial racking in its own facility in Nanjing, China. We export more than 600 containers annually and have completed 3,500+ warehouse storage projects across 60 countries, including a growing portfolio in Costa Rica and the wider Central American corridor.
For Heredia buyers, that matters because the engineer who calculates your seismic load is on the same team that roll-forms, coats and ships the beams. No middle layers, no re-quotes, no ambiguity in the drawings.
Whether you are a distributor in San José, a free-zone operator in Heredia or a 3PL near Juan Santamaría airport, these are the forces redefining how high-rack storage is specified in Costa Rica.
Heredia's Zona Franca footprint continues to grow, driven by medical devices, electronics and shared services. The result: demand for taller buildings and higher-density racking.
US and European brands continue to diversify supply chains into Central America. Heredia DCs are being reconfigured for smaller, faster pallets — favouring selective and carton-flow racking.
Multinational tenants increasingly insist on CE-marked racking for insurance and audit compliance. Choosing a CE-certified supplier from day one avoids costly retrofits.
Even manual warehouses are now designed with future AS/RS and shuttle conversions in mind — with upright and beam tolerances ready for upgrades without rebuilding.
A five-step workflow proven across 3,500+ international projects — designed for buyers who cannot afford re-quotes or shipping delays.
Heredia building plan, pallet data, forklift model and slab details.
Free 2D/3D design, load calculations and itemized pricing in 48 hours.
CE-certified manufacturing in 10–15 days with pre-shipment inspection.
Optimized containers to Puerto Limón or Caldera, with full export files.
Installation drawings, manuals and remote support or on-site supervision.
Total project lead time = production (10–15 days) + ocean transit + Costa Rica customs clearance. The figures below are indicative from major Chinese ports.
| Route | Port of Discharge | Indicative Ocean Transit | Typical Heredia Use Case |
|---|---|---|---|
| China → Costa Rica (Pacific) | Caldera / Puerto Caldera | 25–32 days | Free-zone DCs, medical device plants, 3PL hubs |
| China → Costa Rica (Caribbean) | Puerto Limón / Moín | 28–35 days | Distribution to San José, Limón, Caribbean coast |
| China → Panama (Transship) | Balboa / Colón | 22–30 days | Consolidated loads via Panama hub |
| China → Guatemala (Overland) | Puerto Quetzal → Heredia | 25–35 days + inland | Regional Central America distribution |
Transit times are indicative and vary by carrier, routing and season. Final schedules are confirmed per quotation.
Straight answers to the questions we hear most often from Costa Rican distributors, 3PLs and free-zone operators.
Send us your building plan and pallet data and receive a free racking layout, load calculation and itemized quotation within 48 hours — engineered for Costa Rica's seismic zone and CE-certified for your audit.