
Double Deep Pallet Racking System for High Density Industrial Warehouse Storage
Two pallets deep per bay — a smart fit for Antigua's limited warehouse footprint where every square foot of St. John's real estate counts.
View product
Antigua and Barbuda sits on one of the Caribbean's most active trade crossroads — a duty-free port at St. John's, cruise-and-cargo flow through Deep Water Harbour, and a growing cluster of wholesalers, hotels, supermarket chains and marine suppliers who all need to store more inside limited floor space. That reality demands modular pallet racking that is CE certified, salt-air resistant and dimensionally accurate to survive container shipment and a West Indian climate.
As a direct manufacturer since 2007, we engineer every beam, upright and brace on our own roll-forming lines, verify each batch against the CE conformity file, and load every container from our factory with a detailed packing plan. Antiguan importers work with our engineers, not through trading layers — so the person calculating your beam load is the team that fabricates, coats and ships it.
From single-deep selective bays in St. John's retail DCs to radio shuttle lanes in Caribbean cold stores — each system ships as a fully modular kit with bolt-together components.

Two pallets deep per bay — a smart fit for Antigua's limited warehouse footprint where every square foot of St. John's real estate counts.
View product
Ideal for marine suppliers, boatyards and construction merchants storing pipes, lumber and long stock near English Harbour and Falmouth.
View product
Five-layer anti-rust plating for hardware stores and auto parts resellers in Antigua's coastal humidity — modular shelves reconfigure without tools.
View product
Forklift-in lanes maximise cube for uniform SKU batches — a proven fit for beverage importers and FMCG distributors serving Antigua's supermarkets.
View product
Long-run modular bays engineered for expansion — ideal for the new logistics complexes emerging around VC Bird International Airport.
View product
Direct access to every pallet — the workhorse layout for Antiguan wholesalers carrying thousands of mixed SKUs across small buildings.
View product
Doubles usable area in land-scarce St. John's — supports 1,000 kg/m² of pick faces, offices or light storage with integrated stairways and guardrails.
View product
Q235B structural steel racks engineered for Caribbean freight hubs — heavy-duty capacity with a modular profile built for container shipping.
View productAntigua's economy is service-led — tourism, marine and duty-free retail — with Barbuda adding a small but specialised logistics footprint. Each sector has its own storage challenge, and modular racking adapts to all of them.
Resorts along Dickenson Bay, Jolly Harbour and English Harbour store dry goods, beverages and FF&E across multi-site inventories. Selective pallet racking with modular add-on bays lets central commissaries near St. John's consolidate deliveries while each resort keeps a small satellite store.
Antigua's yachting sector — anchored by the Antigua Charter Yacht Show and Nelson's Dockyard — demands cantilever and long-load racking for rigging, pipes and spars, plus deep pallet bays for boat hardware. Galvanized finishes are essential to resist salt air.
Importers serving Heritage Quay, Redcliffe Quay and the cruise port hold thousands of SKUs in compact downtown warehouses. Multi-tier selective racking and mezzanine pick floors turn small St. John's buildings into efficient retail distribution hubs.
Chains such as those feeding the island's supermarket network rely on drive-in and double-deep bays for uniform pallet loads of bottled water, flour and beverages shipped in from the US and CARICOM.
Hurricane-rebuild projects and resort construction cycles drive steady demand for cement, rebar, roofing and fixtures. Cantilever and heavy-duty pallet systems keep bulky loads accessible on concrete yards near Deep Water Harbour.
With cargo moving between St. John's and Codrington, modular racking that is easy to bolt together after shipment suits small warehouses and community stores on Barbuda, where consolidation happens before the final leg.
Three forces are reshaping how Antiguan warehouses are laid out and equipped in 2024–2026, and each one points toward modular, CE-certified, hurricane-aware racking.
After the destructive 2017 hurricane season that struck Barbuda directly, Antiguan warehouse owners increasingly specify racking with heavier bracing, chemical anchors and slab-bond verification — moves that reduce rack replacement cycles after major storms.
St. John's warehouse rent remains among the highest in the Eastern Caribbean, so operators are adding mezzanine floors and multi-tier selective racking instead of expanding footprints — turning 8-metre clear height into 16 metres of usable storage.
Regional importers now routinely ask for CE conformity documentation before clearing a container at St. John's port, mirroring wider CARICOM adoption of EN-standard rack design. Modular racking with pre-documented certifications clears customs faster.
Four commitments that matter when your supplier is 11,000 km away and your racking has to survive a Caribbean climate.
EN-standard profiles, load-tested beams and traceable batch documentation — certified quality recognised by clients in 60+ countries and accepted across CARICOM.
Professional engineers review your Antigua warehouse plan, calculate seismic and wind loads, and return a 2D/3D layout in 48 hours — no cost, no obligation.
No trading layers between factory and buyer — itemized quotations let Antiguan importers compare landed cost transparently with FOB, CFR or CIF terms.
20+ production lines and 30,000 t annual output ship within 10–15 days of drawing approval, with loading plans that maximise 20ft and 40ft HC containers.
A workflow refined over 3,500+ international projects, shipped to Caribbean ports and beyond.
Send your building plan, pallet data and forklift specs.
Free 2D/3D layout, load calculations and quotation within 48 hours.
Manufacturing in 10–15 days with CE conformity checks before packing.
Container loading plan and full export documentation to St. John's.
Drawings, manuals, remote guidance or on-site supervision.
Plan your project with realistic figures. Total lead time = production (10–15 days) + ocean transit + customs clearance at St. John's.
| Destination | Main Port | Indicative Ocean Transit | Notes for Racking Buyers |
|---|---|---|---|
| Antigua and Barbuda | St. John's (Deep Water Harbour) | 32–42 days | Deep-draft port handles 40ft HC containers; consolidation via Miami adds 3–5 days but cuts freight cost. |
| Barbuda | Codrington (lighterage from St. John's) | +3–7 days | Smaller lighterage consignments; racking assembled on site from modular kits works best. |
| Other Eastern Caribbean | Castries, Bridgetown, Roseau, Basseterre | 28–40 days | Regional consolidators often route through San Juan or Miami; racking ships well. |
| US East Coast transship | Miami, Port Everglades, Savannah | 12–18 days | Option to land racking first, then reload onto an inter-island feeder service. |
Transit times are indicative from main Chinese ports and vary by carrier, transshipment and season. Final schedules are confirmed with each quotation.
Send us your floor plan and pallet data — our engineers will return a free modular racking layout, load calculation and itemized CE-certified quotation within 48 hours.
Inquire Now