
From high-SKU medical device logistics in the Zona Franca to coffee and agro-export cold rooms, each system below is configurable to your pallet data, clear height and seismic requirements.








Cartago sits at the intersection of Costa Rica's free-zone manufacturing corridor and its most demanding cold-chain and agro-export routes. That combination — high-value electronics and medical devices on one side, chilled fruit and coffee on the other — means a single racking system rarely fits every building. As a manufacturer since 2007, our engineers design for both extremes rather than forcing a catalog product onto your floor plan.
We export at least 600 containers every year and have completed more than 3,500 warehouse solutions across Mexico, Central America and South America. Distributors, 3PLs and end users in Cartago work directly with the engineers who calculate your load capacity — not with a reseller relaying questions across time zones.
Generic product pages ignore the four variables that determine whether a racking system survives its first decade in Costa Rica. We engineer for all four.
Costa Rica sits on an active subduction zone. Upright, bracing and anchor calculations are based on your site's seismic zone, soil class and slab data, with reinforced base plates, row spacers and chemical anchors where required.
Phosphated pre-treatment and electrostatic powder coating as standard; hot-dip or pre-galvanized components for Cartago's humid lowland warehouses, coastal ports and chilled rooms storing fruit, dairy or seafood.
Container loading plans built to maximize payload, with FOB, CFR or CIF terms to Puerto Limón and Caldera, and DDP available on request for door delivery to Cartago's industrial parks.
Commercial invoice, packing list, bill of lading and certificate of origin prepared accurately for Costa Rican customs, with Spanish part labels available on request for faster site identification during installation.
Three industries define most of Cartago's pallet movement — each demands a different density, access and temperature profile.
High-SKU, high-turnover pallets in Zona Franca Cartago. Selective pallet racking and carton flow keep every SKU directly accessible for compliance-driven picking and dispatch.
Chilled and frozen rooms for fruit, coffee and dairy. Radio shuttle and drive-in racking maximize pallet positions per cubic meter while keeping airflow and temperature recovery efficient.
Clean, organized multi-level storage for components and finished goods. Mezzanine racking and medium-duty shelving add usable floor area inside existing Cartago buildings without expansion.
Bottled drinks, packaged food and consumer goods moving in homogeneous pallet loads. Drive-in and push-back lanes reduce aisle waste while keeping batch rotation traceable.
Three structural shifts are reshaping how Costa Rican buyers specify racking in 2024 and beyond.
Continued growth of Costa Rica's free-zone regime is pushing medical device and electronics operators toward taller, denser racking — including double deep and radio shuttle — as industrial park space in the Cartago corridor becomes scarcer and more expensive per square meter.
Agro-export and retail cold storage is investing in semi-automated radio shuttle systems that reduce forklift time inside chilled rooms — cutting energy loss from door openings and improving worker safety in sub-zero aisles.
Insurers and corporate EHS teams increasingly require documented seismic calculations before approving racking installations. Buyers now ask for the engineering methodology, not just a load rating — a shift that favors manufacturers who can produce site-specific calculations.
CE and ISO certified materials, controlled roll-forming tolerances and quality recognized by clients in 60+ countries.
Free consultation with professional engineers, free warehouse layout design and the optimal storage solution for your operation.
Factory-direct supply with no trading layers — transparent, itemized quotations for distributors and project contractors.
20+ production lines and 30,000 tons of annual output secure delivery in 10–15 days after drawing approval.
10-Year Warranty Insurance. We cover all racking products for ten years and resolve any quality issue caused by our design, manufacturing, transportation or installation guidance.
A five-step workflow refined across 3,500+ international projects.
Building plan, pallet data, handling equipment, seismic zone and temperature profile.
Free 2D/3D layout, load calculations and itemized quotation within 48 hours.
Manufacturing in 10–15 days with inspection and load checks before packing.
Optimized container loading to Puerto Limón or Caldera with full export documentation.
Installation drawings, manuals, remote guidance or on-site supervision.
Incomplete data is the leading cause of re-quotes and shipping delays on overseas projects. Sharing these details upfront lets our engineers deliver a correct, buildable design on the first pass.
Total lead time = production (10–15 days) + ocean transit + local customs clearance. Final schedules are confirmed with each quotation.
| Destination | Main Ports | Indicative Ocean Transit | Typical Racking Demand |
|---|---|---|---|
| Cartago / San José | Puerto Limón (Caribbean), Caldera (Pacific) | 25–35 days | Free-zone 3PL, medical devices, e-commerce |
| Alajuela / Heredia | Caldera, Puerto Limón | 25–35 days | Electronics, precision manufacturing, retail DCs |
| Guanacaste & Coastal Regions | Caldera | 25–32 days | Cold chain, agro-export, hospitality supply |
| Panama & Regional Hubs | Balboa, Colón | 25–33 days | Cross-dock and consolidated distribution centers |
Transit times are indicative from main Chinese ports and vary by carrier, transshipment and season.
Send us your floor plan, pallet data and seismic zone details. You will receive a free racking layout, load calculation and itemized quotation within 48 hours — delivered directly by the engineers who build and ship your system.