
Q235 Steel 2000kg Capacity FIFO High Density Industrial Warehouse Storage Gravity Pallet Flow Rack System
Roller-lane FIFO pallet flow for beverage, FMCG and distribution hubs where stock rotation is critical.
View product
Since 2007, Lottot has designed and manufactured industrial storage systems in its own facility, exporting at least 600 containers every year and completing more than 3,500 warehouse solutions across 60+ countries. For distributors, 3PLs and end users in Tegucigalpa and the wider Francisco Morazán corridor, that means the engineer who calculates your load capacity is the same team that builds, checks and ships your racking.
Choose by pallet turnover, SKU count and building height. Our engineers will recommend the right system — or a combination — after reviewing your layout.

Roller-lane FIFO pallet flow for beverage, FMCG and distribution hubs where stock rotation is critical.
View product
Telescopic arms store aluminum profiles, tubes and long loads without obstruction from front uprights.
View product
Stackable metal racks for overflow stock, garage storage and small-business warehouses in Tegucigalpa.
View product
100% direct access to every pallet — the most versatile choice for Tegucigalpa distributors and retail DCs.
View product
Outdoor-rated cantilever racking for lumber yards and construction material depots around Tegucigalpa.
View product
Double-sided arms for PVC pipes, steel bar and long loads in hardware and construction supply warehouses.
View product
Stacked steel racking for scrap yards, auto dismantlers and vehicle storage operators in Honduras.
View product
Rack-supported mezzanine floors that double usable area inside tight Tegucigalpa industrial buildings.
View productSend your floor plan, pallet data and lift height. Our engineers return a free layout and itemized quote within 48 hours.
Warehouses in Tegucigalpa and around Puerto Cortés face specific realities that generic catalog racking ignores: tropical humidity, seismic risk, long ocean routes from Asia and strict customs paperwork. We engineer for all four.
Honduras sits near active tectonic zones. Our engineers calculate upright, bracing and anchor requirements from site seismic data, slab thickness and floor strength.
Phosphated and electrostatic powder-coated steel as standard, with hot-dip galvanized options for Tegucigalpa rain season, coffee warehouses and cold rooms.
Container plans maximizing payload for Puerto Cortés and Puerto Castilla, FOB/CFR/CIF terms and DDP on request for Tegucigalpa end users.
Commercial invoice, packing list, bill of lading and certificate of origin prepared for Honduran customs, with Spanish part labels on request.
Tegucigalpa's industrial stock is increasingly dominated by high-throughput distribution, nearshoring spillover from the Sula Valley, coffee and agro-export consolidation, plus a fast-growing e-commerce pick-and-pack segment. Rising urban land cost inside the city ring makes vertical storage and mezzanine reuse a more attractive investment than new leases — while new bonded and free-zone logistics parks near Palmerola and along the CA-5 corridor drive demand for high-density systems.
FIFO carton flow and pallet rack for green coffee, grains and food staples.
Carton flow, shelving and mezzanine for fulfillment hubs in Tegucigalpa and San Pedro Sula.
Organized shelving for medicine distributors, supermarkets and malls in the capital.
Drive-in and shuttle lanes for drinks, water and consumer goods distribution.
Four commitments that matter when your supplier is an ocean away from Tegucigalpa.
CE and ISO certified materials, controlled roll-forming tolerances and quality recognized by clients in 60+ countries.
Free consultation with professional engineers, free warehouse layout design and the optimal storage solution for your operation.
Factory-direct supply with no trading layers — transparent, itemized quotations for Tegucigalpa distributors and project contractors.
20+ production lines and 30,000 tons of annual output secure delivery in 10–15 days after drawing approval.
10-Year Warranty Insurance. We cover all racking products for ten years and resolve any quality issue caused by our design, manufacturing, transportation or installation guidance.
Plan your project timeline with realistic figures. Total lead time = production (10–15 days) + ocean transit + Honduran customs clearance + inland trucking to Tegucigalpa.
| Destination | Main Ports | Indicative Ocean Transit | Typical Racking Demand |
|---|---|---|---|
| Tegucigalpa & Central Honduras | Puerto Cortés, Puerto Castilla | 28–38 days | Retail DCs, pharma, coffee consolidation, 3PL |
| San Pedro Sula & Sula Valley | Puerto Cortés | 28–35 days | Nearshoring plants, textile, FMCG distribution |
| Guatemala / El Salvador | Puerto Quetzal, Acajutla | 25–35 days | Regional FMCG distribution and textiles |
| Nicaragua | Puerto Corinto | 30–40 days | Food staples, agricultural supply |
| Costa Rica / Panama | Caldera, Limón, Balboa, Colón | 25–35 days | Medical devices, free-zone logistics hubs |
| Colombia / Ecuador / Peru | Buenaventura, Guayaquil, Callao | 25–38 days | Flowers, seafood cold chain, mining spares |
| Chile / Brazil / Argentina | San Antonio, Santos, Buenos Aires | 30–45 days | Seismic-rated, automotive, beverage, large DCs |
Transit times are indicative from main Chinese ports and vary by carrier, transshipment and season. Final schedules are confirmed with each quotation. DDP to Tegucigalpa available on request.
Send us your floor plan and pallet data. Our engineers will return a free racking layout, load calculation and itemized quotation within 48 hours — with FOB Puerto Cortés, CFR or DDP pricing on request.
Contact Us