
OEM ODM CE Heavy Duty Steel Cantilever Rack for Lumber Storage
Outdoor-rated cantilever racking for timber, pipes and long loads with reinforced arm-end protection.
View ProductEach system below can ship with integrated push-through protection, guide-entry accessories, column guards and corner alarms — engineered and priced from our own factory.

Outdoor-rated cantilever racking for timber, pipes and long loads with reinforced arm-end protection.
View Product
Adjustable beam levels and push-through safety accessories for high-turnover Salvadoran and Costa Rican DCs.
View Product
Corrosion-resistant finish for humid Caribbean and Pacific coastal warehouses in Costa Rica.
View Product
Heavy-duty arm-end caps and column guards protect long-item storage in construction yards.
View Product
100% selective access — ideal for medical-device and 3PL free zones requiring frequent picking.
View Product
European-standard profiles with push-through guides for safe forklift entry in distribution hubs.
View Product
Gravity flow lanes with lane-end stops and push-through safeguards for cold-chain produce.
View Product
Column guards, corner alarms, guide-entry rails and push-through beams — full protection bundle.
View ProductFrom the Greater Metropolitan Area (GAM) to Limón and Puntarenas free zones, our racking is engineered for seismic activity, tropical humidity and rapid 3PL turnover.
Costa Rica sits on an active convergent margin. We calculate upright, beam and anchor loads against your site's seismic zone and slab data, specifying reinforced base plates and heavier bracing where needed.
Phosphated, electrostatically powder-coated steel as standard; hot-dip galvanized variants for Caribbean coastal warehouses such as Limón and Moín where salt air accelerates corrosion.
Engineered guide-entry rails, pallet stops and beam-end caps prevent forklift push-through — the leading cause of rack collapse and pallet loss in high-turnover distribution centers.
Commercial invoice, packing list, bill of lading and certificate of origin prepared accurately for Costa Rican customs (Hacienda) — Spanish part labels available on request.
Boltless beam connectors and interchangeable upright profiles let Costa Rican 3PLs reconfigure bays in hours — without new tooling or long import cycles.
20+ roll-forming lines and 30,000 tons of annual capacity secure delivery in 10–15 days after drawing approval — keeping Costa Rican project cycles on schedule.
Push-through protection is the engineering layer that stops a forklift or pallet from pushing a beam out of its connector — the single most common cause of racking collapse in Latin American warehouses.
Every selective pallet rack ships with safety beam locks, but a beam lock alone does not prevent a beam from being pushed upward and off the connector when a forklift strikes it from the rear. Push-through protection solves this with three complementary components engineered and tested at our factory:
Most racking collapses in Central American warehouses are not caused by overload — they are caused by unprotected beam-ends struck from the rear during blind pallet placement. Our push-through kit reduces that failure mode by an estimated 70% in high-turnover DCs, based on internal inspection data from 3,500+ delivered projects.
Costa Rica's economy is anchored by medical devices, agro-export, tourism, and free-zone logistics — each with a distinct racking profile.
Clean-room adjacent DCs in Alajuela and Heredia benefit from powder-coated, low-dust racking with reinforced column guards.
Pineapple, banana and coffee exporters in Limón and San Carlos rely on galvanized racking and shuttle systems for chilled rooms.
Carton flow and mezzanine systems near San José serve fast-growing e-commerce with minimal building footprint.
Component warehouses in the GAM require heavy-duty selective racking with push-through protection for high daily pallet moves.
Cantilever racking in Puntarenas and Guanacaste for pipe, rebar and timber storage with reinforced arm-end protection.
Drive-in and shuttle racking for bottled beverages and consumer goods with high pallet-to-pallet impact risk.
Three forces are accelerating the shift toward factory-direct, safety-protected racking across Costa Rica.
Multinationals relocating from Asia to Costa Rica's free zones are demanding rapid, factory-direct racking supply.
INS-aligned safety inspections push Costa Rican warehouses to retrofit push-through protection on existing racking.
Medical and food cold-chain capacity is expanding, driving demand for galvanized, moisture-resistant racking in HACCP facilities.
Land prices in the GAM push warehouses toward mezzanine and shuttle systems that maximize pallets per square meter.
A refined five-step workflow proven across 3,500+ international projects.
Send your building plan, pallet data and handling equipment.
Free 2D/3D layout, load calculation and quotation within 48 hours.
Manufacturing in 10–15 days with inspection before packing.
Optimized container loading and full export documentation.
Drawings, manuals, remote guidance or on-site supervision.
Total lead time = production (10–15 days) + ocean transit + local customs clearance.
| Destination | Main Port | Ocean Transit | Typical Demand |
|---|---|---|---|
| San José / GAM | Puerto Caldera (Pacific) | 25–35 days | Medical devices, e-commerce, 3PL |
| Limón Province | Puerto Limón / Moín (Caribbean) | 28–38 days | Banana & pineapple export, cold chain |
| Alajuela Free Zone | Puerto Caldera | 25–35 days | Medical device manufacturing DCs |
| Puntarenas | Puerto Caldera | 25–35 days | Construction materials, agro-export |
| Guanacaste | Puerto Caldera | 25–35 days | Hospitality supply, agri-business |
| Heredia / Cartago | Puerto Limón / Moín | 28–38 days | Free-zone logistics, distribution |
Transit times are indicative from main Chinese ports and vary by carrier, transshipment and season. Final schedules confirmed with each quotation.
Four commitments that matter when your supplier is an ocean away from Costa Rica.
CE and ISO certified materials, controlled roll-forming tolerances and quality recognized by clients in 60+ countries.
Free consultation with professional engineers, free warehouse layout design and the optimal storage solution for your operation.
Factory-direct supply with no trading layers — transparent, itemized quotations for distributors and project contractors.
20+ production lines and 30,000 tons of annual output secure delivery in 10–15 days after drawing approval.
Send us your floor plan and get a free racking layout, load calculation and itemized quotation within 48 hours — including push-through protection specifications.