Connect 1 row of MK bracing brackets to the inside of the columns positioned at the ends. Meanwhile, connect 2 rows of brackets to both sides of the columns in the intermediate sections, as shown.
Position column (1) vertically into the fixing MK base, as shown. Connect the column and the base with M20×40 bolts (7). Fasten the other M20×40 bolts (7) on the base. Recommended torque: 86–103 N·m.
The standard composition of the vertical bracing, after it has been fastened to the columns, is as shown in the illustration.
The bases must be leveled with metal leveling plates if necessary. Then fully tighten the M20×40 bolts (7) on the base front as indicated in Step 2. Use the drill holes in the bases to fasten them to the floor; use a Ø14 bit and drill a hole with a minimum depth of 100 mm. Remove the drilling remains and carefully hammer in the fastening M10×160 anchors (11). Firmly bolt the fastening plate in place. Recommended torque: 50 MN.
The arm (12) is fastened to the column (1) using safety pins Ø29×140 (13). Fit the arms (11) according to the heights and distribution shown on the corresponding project drawing, where applicable.
Finally, the completed structure should look like the illustration.
Design drawing → Confirm drawing → Quotation → PI → Confirm PI → Arrange 30% deposit → Manufacture → QC inspect → Pay balance → Shipping
MOQ: No, but good quantity comes with a good price. We recommend the order quantity for regular Jracking products to fit at least one 20ft container, which is about 15 tons.
Tooling fee: For the production of necessary tooling requirements, Jracking charges the cost before the first order for opening a new mold, and the cost will be partially or fully refunded after a certain quantity of orders.