Jracking Industrial Rack Storage Shelves CE Certified Heavy-Duty Cantilever Racking for Warehouse Pipe Storage

Product Description

Cantilever racking system
Cantilever racking structure
Name
Cantilever Racking
Material
Q235B Steel
Size
Customized Size
Color
Customized Color
Depth
Customized
Weight Capacity
1000kg/arm
Width
Customized
Height
Customized
Finish
Powder coating; Hot Dip Galvanized
Packing
Export Package
Certification
RMI/CE/ISO/TUV/AS4084-2012
MOQ
One 20ft/40ft Container
Free Sample
Available (Delivery Cost on Buyer)
OEM
Available
Cantilever racking installation step 1
1
Connect 1 row of MK bracing brackets at the inside of columns positioned at ends, meanwhile connect 2 rows of brackets at both sides of columns in intermediate, as shown.
Cantilever racking installation step 2
2
Position the column (1) vertically. Position column (1) into the fixing MK base, as shown. Connect the column and the base with M20×40 bolts (7). Fasten the other M20×40 bolts (7) on the base. Recommended torque: 86–103 N·m.
Cantilever racking installation step 3
3
The standard composition of the vertical bracing, after it has been fastened to the columns, is as shown in the illustration.
Cantilever racking installation step 4
4
The bases must be leveled with metal leveling plates if necessary. Then, fully tighten the M20×40 bolts (7) on the base front as indicated in step 2. Using the drill-holes in the bases for fastening them to the floor, use a Ø14 bit and drill a hole with a minimum depth of 100 mm. Remove the drilling remains and carefully hammer in the fastening M10×160 anchors (11). Firmly bolt the fastening plate in place. Recommended torque: 50 N·m.
Cantilever racking installation step 5
5
The arm (12) is fastened to the column (1) using safety pins Ø29×140 (13). Fit the arms (11) according to the heights and distribution shown on the corresponding project drawing, where applicable.
Cantilever racking installation step 6
6
Finally, the completed structure should look like the illustration.
FAQ
Q
What are your trading terms?
A
1)
Payment terms: T/T 30% deposit after order confirmed, 70% balance paid against bill of lading. L/C O/A also available.
2)
Lead time: normally in 20–25 days after deposit received.
3)
Sample policy: samples are always available for each model. Samples can be ready in 7–15 days once payment received.
4)
Shipping port: Shanghai / Nanjing China.
5)
Discounts: we offer good discount for large quantity.
Q
How can I arrange delivery of my goods?
A
1)
Sea freight: we will update sea freight once we know your sea port where goods will be delivered.
2)
Agent designated by client: please tell us the contact detail of your shipping agent and we will arrange to deliver the items.
Q
What services do you provide?
A
1)
Your inquiry related to our products or price will be replied in 12 hours.
2)
Well-trained and experienced staff answer all your inquiries in fluent English.
3)
OEM & ODM, any customized racking we can help you to design product.
4)
We have very experienced professional engineers to make best solutions.
Q
What is the purchasing process?
A
Design drawing → Confirm drawing → Quotation → PI → Confirm PI → Arrange 30% deposit → Manufacture → QC inspect → Pay balance → Shipping
Q
What are your advantages?
A
1)
Payment: we can do O/A 40–60 days.
2)
Lead time: for rush orders, we can arrange fast delivery.
3)
Factory price: factory direct sale competitive price.
4)
Warranty: two years warranty, the broken parts will be replaced and sent to you.
Q
Do you have a MOQ and how are tooling fees charged?
A
MOQ: No, but good quantity comes with good price. We recommend the order quantity for regular products of Jracking to fit at least one 20ft container, which is about 15 tons.
Tooling fee: For the production of necessary tooling requirement, Jracking charges the cost before the first order for opening new mold, and the cost will be partially or fully refunded after certain quantity of orders.

Related Products