Loading
The carrying cart runs along the inclined support rail. The 1st pallet is placed on the carrying cart, the 2nd pallet pushes the 1st pallet back into the rack, the 3rd pallet pushes the front 2 pallets into the rack, and the rest follow the same operation.
Unloading
The pallet at the pick-up end is carried out first, and the next pallet slides to the pick-up point by gravity for unloading; the others follow the same operation.
Unlike drive-in pallet rack, the forklift truck does not drive into the rack.